Princeton Ct, Cheektowaga
Mill and Overlay: Milled off entire driveway to allow for 1.5" of type 7f top.
N Forest, Amherst
Full Tear Out: In October of 2021 we removed old concrete and entire sub-base. Placed underlayment fabric, 10" of #2 crushed stone and 2" of type 3 binder. Then in summer of 2022 we milled a section of the existing driveway and overlayed with 1.5" of type 7f top.
Boadway, Alden
Sub-development paving: Final graded stone to prep for roadway and driveway paving. Pave roadway with 3" Type 3 Binder and 1-1/2" of Type 7f Top. Driveways 2" and 1" respectively.
Millersport Hwy, Amherst
Parking Lot Extension: Removed existing soil, placed underlayment fabric, 12" of #2 crushed stone, 3" of type 3 binder. Will be topping with 1-1/2" of type 7f top in summer of 2023.
Wellingwood, Williamsville
Full Tear Out: Removed existing blacktop and entire sub-base. Put down underlayment fabric, 8" of #2 crushed stone, and then placed the 2" of type 3 binder. After the binder was completed we formed and poured the apron, curb, and a long section of sidewalk. A month later once the concrete fully cured we came back and placed 1" of type 7f top.
Millersport Hwy, Amherst
Paved Existing Stone Driveway: Graded existing stone, removed a couple soft areas and replaced with 8" of #2 crushed stone. Placed 2" of type 3 binder and 1.5" of type 7f top.